Sunday, June 16, 2013

Insulation and Drywall

Week 7 of our project.

One of Joe's bigger tasks this past week was to remove the sliding glass door that leads out to the porch as well as the windows on either side of it. But rather than take the door out completely, he moved it a few feet inside the house so it can serve as a barrier to help keep drywall dust from getting into our home once they begin the mudding and sanding phase this week.

Besides moving the door, the main focus for this week was getting the space insulated and hanging drywall. The drywall should be finishing up as I type this update.

Joe plans to begin putting cedar siding on the south and west sides of the porch tomorrow. The east side will have to wait until the replacement window arrives and is hung. While he waits for that he plans to begin laying out the joists for the deck.

I'm looking forward to watching the deck being built. We're going to use a composite material for the flooring and railing, one that will require no future maintenance. Who has time for that in retirement? The only catch with using the composite material is that you don't want to get any paint on it because it's nearly impossible to remove. The pergola will need to be painted and to minimize the risk of having paint drip onto the decking while painting it, Joe is going to build the pergola before he installs the decking. He says this will be the most elaborate pergola he's ever done. We're looking to create a couple of different levels to break it up some but we haven't yet firmed up those plans.

And here's an overview of the project. You can see the pergola to the left of the image.




Here's a video of some of what went on over the past week...